Category: Industrial facilities

TIGAR TYRES MIXING MILL, PIROT, SERBIA

DESIGN: 2014-2015

CONSTRUCTION: 2015

AREA: 22.500 sq.m.  + 11.500 sq.m.  (PHASES 1 AND 2)

SCOPE OF WORK: DETAIL DESIGNS, CONSTRUCTION DESIGNS, AS-BUILT DESIGNS,  OBTAINING ALL PERMITS

OTHER: INCREASE OF YEARLY PRODUCTION BY 4 (FOUR) MILLIONA TYRES IN PHASE 1 AND ANOTHER 8 (EIGHT) MILLION TYRES IN PHASE 2


Top